Bid to Boots

Bid to Boots · Contractor handoffs

Give your foreman a job packet they can use.

Turn the scope, schedule, and site notes you already have into a short crew brief and a separate PM decision sheet. See what’s ready — and what needs an answer — before anyone rolls.

Deliverable 01
Crew brief — field copy
Deliverable 02
PM decision sheet — office copy
Pilot
One job · one review · one revision

Juniper Exchange Field sheet FS-01 · Level 1 finish refresh

Rev 01 · Dec 4, 2026
Release: M. Rivera, PM — W1 only

Released — work may start Hold — no entry, no setup
StagingMarked bay beside the west loading door. Keep corridor & exits clear.
W2 conditionWritten PM release after tenant access is confirmed. See Q-01.
PhotosBefore, setup & finish for each released area, labelled by area.
W1 — Released
W2 — On hold
1 open decision · Q-01
Fictional sample · Rev 01

The service

One scope. Two useful handoffs.

01 / CREW

Foreman & crew

Clear work limits, access, sequence, readiness checks, and required photos. Spot an access problem before it costs the crew a trip or surprises the customer.

02 / OFFICE

Project manager

Open decisions with owners, deadlines, and source references. Resolve scope questions early and document potential extras before work starts, so you can price and approve them.

Fictional occupied commercial project

Sample packet — Juniper Exchange

A Level 1 finish refresh. The west corridor is released. A tenant access question holds work in the Suite 240 entry alcove.

Crew brief PM decision sheet

Juniper Exchange · Field copy

Crew brief

PRINT OR SAVE AS PDF — PM SHEET STAYS OUT OF THE PRINT LAYOUT

Revision
01 · Dec 4, 2026
W1 start
Mon, Dec 7 · 6:30 a.m.
PM release
M. Rivera · W1 only

W1 · Released in sample

West common corridor

Patch scuffs and repaint the two marked wall sections between reception and the west stair. Protect the floor and adjacent finishes.

Excluded. Doors, trim, floors, ceilings, and unmarked walls.

Refs — S-01 · A-01 · P-01

W2 · Hold all entry and setup

Suite 240 entry alcove

Once released, patch and repaint marked alcove walls only. Suite interiors, doors, and trim are outside scope.

Wait for the PM’s written release after tenant access is confirmed.

Refs — S-01 · P-01 · Q-01

Sequence & owners

  1. Foreman. Check in at the west service entrance. Confirm limits, approved finish, and clear exits.
  2. Paint crew. Protect finishes, patch, repaint, and clean up during the W1 window.
  3. Foreman. Take finish photos, clear staging, and report completion to the PM.
  4. PM. Issue written W2 release after confirming access. Foreman briefs the crew before W2 setup.

Access & readiness

  • Stage beside the west loading door in the marked bay. Keep the corridor and exits clear.
  • W1 work window is Monday, 6:30–8:30 a.m. Clear the corridor by 8:30 a.m.
  • Confirm finish, protection, and current site conditions. Escalate changes to the PM before starting.
  • Keep occupied suites undisturbed. Photograph work without including people or tenant materials.

Required photos. Take before, setup, and matching finish photos for each released work area. Label by area and phase and submit through the approved project channel.

Juniper Exchange · Office copy

PM decision sheet

NOT PART OF THE CREW PRINT

Revision
01 · Dec 4, 2026
Approver
M. Rivera · Project Manager
Status
W1 released · W2 pending

Open · Q-01

Confirm tenant access for W2

Owner
M. Rivera · confirm with building management
Deadline
Mon, Dec 7 · 2 p.m. local
Decision & consequence
Release in writing once confirmed. If unresolved, keep the hold and pull W2 from Tuesday’s plan.

Source record

S-01 · Accepted scope · Nov 25
W1 and W2 marked walls only. Doors, trim, floors, and ceilings excluded.
A-01 · Site access note · Dec 2
W1 hours, west loading-door staging, and occupied corridor restrictions.
P-01 · Approved schedule · Dec 3
W1 Monday morning. Tuesday W2 slot conditional on written access release.
Q-01 · Open item · Dec 4
Tenant access for W2 remains unconfirmed.

Job margin calculator

See what a change costs — before you commit.

Enter the contract, your target margin, and the two cost lines. The worksheet totals the job, works out gross profit and margin, and measures the result against the cost limit your target allows. Loaded with the same fictional Juniper numbers used in the sample packet.

Margin worksheet Gross margin · contract less all job costs

FORM MC-01

Change any figure — an added trip, a labor change — and the result updates as you type. Nothing is saved or sent.

Result — updates as you type
Contract amount—
Company costs—
Crew payment—
Total job cost—
Cost limit at target margin—
Gross profit——

Enter the four figures to see the result.

One-job pilot

Start with one job or phase.

Dallas uses your approved scope and schedule to prepare a crew brief and PM decision sheet. The pilot includes one PM review and one revision. Your PM approves the packet, directs the crew, and handles follow-up.

What to bring

  • Accepted scope and current schedule
  • Work areas, access notes, and staging limits
  • Foreman, PM approver, and unresolved items